PROJECT STATISTICS
PROJECT NARRATIVE
Provided the design, phasing plan, and construction administration of a new trench drain system for a vehicle delivery area totaling 15,000 square feet. In addition to the trench drain system, the design included 8,000 square feet of asphalt-to-concrete replacements. Mr. Omran was responsible for the structural and electrical coordination between engineers, architects, and contractors.