Roadway Study, JFK Terminal 5

16

PROJECT STATISTICS

5,000
NA
3
2019
LINEAR FEET
THOUSAND DOLLARS
MONTHS
D/B/B
YEAR

PROJECT NARRATIVE

Surveyed and located water damage occurring at the baggage level of Terminal 5 from the raised roadway above. This included a comprehensive report of leakage problems and recommended solutions.