PROJECT STATISTICS
PROJECT NARRATIVE
Stemming from cooling issues on the first floor of Terminal 3 at Fort Lauderdale Airport, Mr. Omran conducted a survey and evaluation of 20,000 square feet of space. This included an assessment of the existing HVAC units, as-built drawings, and heat load study of people, equipment, and infrastructure. The final report also included recommendation(s) for the units and entire space.