Image of P-8 flying with Naval Air Station Patuxent River in the Background Courtesy of the US Navy.

DESIGN / BUILD TEAM

ARCHITECT & INTERIORS
CIVIL ENGINEER
STRUCTURAL ENGINEER
MEP, FIRE & LIFE SAFETY
DESIGN BUILDER

GIULIANI ASSOCIATES
TIMMONS GROUP
THORNTON TOMASETTI
CONSOLIDATED ENGINEERS
GRUNLEY

PROJECT STATISTICS

10,000

SQUARE FEET

10

MILLION DOLLARS

12

MONTHS - DESIGN/BUILD

PROJECT NARRATIVE

The P-8A program includes a offices, computer control room, and a training system with a partial fuselage of the aircraft similar to a commercial 737 aircraft. The real-time collaboration greatly enhanced communication between all parties, reduced travel, printing, and shipping costs, which allowed the design/build team and owner to focus on design and construction. The project is LEED Silver. Both Goel and Giuliani Associates helped the Grunley/Goel/Giuliani P-8A team meet the Small Business requirements established by NAVFAC for the project. Goel and Giuliani Associates worked to bring a complex project together with the Navy’s third party vender Boeing. The facility includes simulation equipment for testing future systems which require a high level of standards.